| Module code:  BIMA270 | 
|  | 
| 4VU (4 hours per week) | 
| 6 | 
| Semester: 2 | 
| Mandatory course: no | 
| Language of instruction: German
 | 
| Assessment: Written exam
 
 [updated 28.09.2020]
 
 | 
| BIMA270 (P110-0118) Civil and structural engineering, Master, ASPO 01.04.2012
, semester 2, optional course
 BIMA270 (P110-0118) Civil and structural engineering, Master, ASPO 01.04.2015
, semester 2, optional course,
 BIMA270 (P110-0118) Civil and structural engineering, Master, ASPO 01.10.2017
, semester 2, optional course,
 
 | 
| 60 class hours (= 45 clock hours) over a 15-week period. The total student study time is 180 hours (equivalent to 6 ECTS credits).
 There are therefore 135 hours available for class preparation and follow-up work and exam preparation.
 
 | 
| Recommended prerequisites (modules): None.
 
 | 
| Recommended as prerequisite for: 
 | 
| Module coordinator: Prof. Dr. Markus Enders-Comberg
 | 
| Lecturer: Lehrbeauftragte
 Prof. Dr.-Ing. Ingrid Düsing
 
 
 [updated 02.11.2020]
 
 | 
| Learning outcomes: After successfully completing this module, students will:
 _ be familiar with the modeling, design and calculation methods of steel bridge construction and steel composite bridge construction.
 _ be able to design and dimension steel bridges and composite bridges in a technically and economically appropriate manner.
 _ be able to scientifically work through technically demanding, detailed problems and implement this knowledge in creating practical construction solutions.
 
 
 [updated 28.09.2020]
 
 | 
| Module content: _ Effects on road and railway bridges
 _ Materials used
 _ Economic and fatigue-resistant design
 _ Calculation and design of steel and steel composite bridges
 _ Production and assembly
 _ Bridge maintenance
 
 
 [updated 28.09.2020]
 
 | 
| Recommended or required reading: _        Effects on road and railway bridges
 _ Materials used
 _ Economic and fatigue-resistant design
 _ Calculation and design of steel and steel composite bridges
 _ Production and assembly
 _ Bridge maintenance
 
 
 [updated 28.09.2020]
 
 |